Closer to what matters
Society

Paralimni-Deryneia wins approval for €10m Kapparis-Protaras coastal walk

The 6.5-kilometre fourth phase of the Protaras seafront promenade has cleared planning, though construction drawings, a building permit and a tender still lie ahead.

2 min read
Illustration, not a photo of the event

Planning approval has been granted for a 6.5-kilometre addition to the Protaras coastal path, a fourth phase that would let people travel on foot or by bicycle between Kapparis and the resort's popular beaches. Paralimni-Deryneia municipality puts the provisional cost at €10 million.

The route is to begin at the new Paralimni marina, pass through Kapparis and finish at the United Nations coastal post on the Deryneia boundary. The existing promenade already connects the Golden Coast fishing shelter with the Protaras tourist area.

Work cannot start yet: construction drawings and technical studies remain unfinished, a building permit has not been issued, and a tender will follow only after both are in place. The design features a wooden walkway, pebbled paving, rest areas and public toilets.

Editorial note

What it means for residents

For people living in Kapparis, Paralimni and Deryneia, the plan promises a safer, car-free way to reach the beach and the marina, and could ease summer traffic and parking pressure along that coastal strip. Nothing changes on the ground soon, since the paperwork and the tender still have to be completed.

  • Expect no closures yet: the timeline depends on the building permit and the tender, so local disruption is not imminent.
  • Watch for tender news: the municipality's announcements will be the first sign that construction is approaching.
  • Businesses along the route: cafés, rentals and watersports operators in Kapparis may see more foot traffic once the path opens.
Source
Original article

This text is written from the source article and is not a translation of it.

Related News